Soldier Pile and Lagging Walls Information - Review Options in DeepEX Software

Soldier pile and lagging walls, commonly known as soldier piles, are some of the oldest forms of retaining wall systems used in deep excavations. Soldier pile walls have successfully being used since the late 18th century in metropolitan cities like New York, Berlin, and London. The method is also commonly known as the "Berlin Wall" when steel piles and timber lagging is used. Alternatively, caissons, circular pipes, or concrete piles can also be used as soldier piles but at an increased cost. Timber lagging is typically used although reinforced concrete panels can be also utilized for permanent conditions. Soldier pile walls are formed by:

1. Constructing soldier piles at regular intervals (6 ft to 12 ft, typical)
2. Excavating in small stages and installing lagging.
3. Backfilling and compacting the void space behind the lagging.

Moment resistance in soldier pile and lagging walls is provided solely by the soldier piles. Passive soil resistance is obtained by embedding the soldier piles beneath the excavation grade. The lagging bridges and retains soil across piles and transfers the lateral load to the soldier pile system.

Soldier_Piles_in_Seattle_DeepEX_Project.jpg

Fig. Soldier Pile Walls with Tiebacks - Project Designed with DeepEX Software

Which wall system is best for your case?

Make the right choice - SignUp

DOWNLOAD FREE TRIAL

Advantages & Disadvantages of Soldier Pile Walls

Soldier pile and lagging walls are the most inexpensive systems compared to other retaining walls. They are also very easy and fast to construct. The major advantages of soldier pile walls are:

1. Soldier piles are fast to construct.
2. Soldier pile construction is cheaper when compared to other systems.
3. Soldier pile installation is versatile and adjustments can be made in the field easily to accomodate changes.
4. Lagging construction can be very quick.
5. Construction of soldier pile and lagging walls does not require very advanced construction techniques.

Common lagging materials include timber, shotcrete, precast concrete panels, or steel plating. Permanent transporation walls usually utilize precast concrete panels while temporary soldier pile walls in the US utilize timber lagging.

The major disadvantages of soldier pile and lagging systems are:

1. They are primarily limited to temporary construction.
2. Cannot be used in high water table conditions without extensive dewatering.
3. Poor backfilling and associated ground losses can result in significant surface settlements.
4. They are not as stiff as other retaining systems.
5. Because only the flange of a soldier pile is embedded beneath subgrade, it is very difficult to control basal soil movements.

2nd_Hope_Station_LA_Designed_DeepEX.jpeg

Fig. 2nd and Hope Station, Los Angeles, CA - Project Designed with DeepEX Software

Training Video - A Soldier Pile and Lagging Wall with Rakers Designed with DeepEX:

Presentations_DeepEX_Projects.png

 

Learn How to Design an Excavation
in Minutes!

Book a Free Web Presentation

Trusted By

1. Logo Arup.JPG
2. Logo Keller.JPG
3. Logo PBA.JPG
4. Logo AECOM.JPG
5. Logo Hatch.JPG
6. Logo Mottmac.JPG
7. Logo Jacobs.JPG
8. Logo GZA.JPG
9. Logo GarretFlaming.JPG
10. Logo Lavalin.JPG
11. Logo Magnusson Klem.JPG
12. Logo MoDOT.JPG
13. Logo URS.JPG
14. Logo Stalworth.JPG
15. Logo Kleinfelder.JPG
16. Logo Samsung.JPG
17. Logo Gepfreeze.JPG
37._Logo_ASAP.jpg
19. Logo GulfConstruct.JPG
20. Logo Temeltas.JPG
21. Logo AttikoMetro.JPG
22. Logo Flatiron.JPG
23. Logo Kozaba.JPG
24. Logo Siefert.JPG
25. Logo AlGhuair.JPG
26. Logo Earthtech.JPG
27. Logo Russo.JPG
28. Logo Danbro.JPG
29. Logo Atkins.JPG
30. Logo LBFoster.JPG
31. Logo Dominion.JPG
32. Logo Acons.JPG
33. Logo NSCC.JPG
34. Logo Econstruct.JPG
35. Logo AUD.JPG
18. Logo Eptisa.JPG