Deep Excavation LLC designed the temporary excavation shoring system for the new Lehman College science building. The excavation consisted of two levels of rock anchors with a drilled soldier pile and timber lagging wall. The excavation was completed in 2009.
Deep Excavation LLC provided detailed structural and civil design of new coal storage and kiln feeding department including more then 10000 mc of r.c. and more than 500 mc r.c. and about 500 metric tons of steel structures. This job was completed in a joint venture with CeAS S.r.l. This project was completed in October of 2008.