Tel: 1-206-279-3300

DeepEX 2020

Solving Deep Excavation Design

DeepEX 2017 talk to it and design your deep excavation!

Deep Foundation Software, Pile Rafts, Pile Groups

From soil estimation to axial and lateral pile capacity

DeepFND - Deep Foundation Software, caissons, CFA, drilled piles, driven piles, concrete, timber

From soil estimation to helical pile settlement estimation.

New helical pile software HelixPile

Excavations in 3D, VR, AR

Holographic model of a deep excavation with HoloDeepEX

Get the Free 3D Viewer

______________________

Free 45 min webinar

Deep Excavation Design

Fully booked!

Free Helical Pile Design Webinars:

To be announced

2-Day Deep Excavation and Soil nail wall design Workshop

16 PDH @ Plano, TX

Sep 30, Oct 1st, 2019

Only 1 spot left!

Renaissance Hotel, Legacy West

Renaissance Hotel Plano Legacy West

Early registration ends soon!

Signup for a free trial and get our free pdf on the five most common errors in deep excavation design
What do you want to design?
DeepFND 2020: Deep Foundation software (NEW: Pile-Group/Pile Raft Analysis!)
DeepEX 2020: Deep Excavation software
Soldier pile walls
Sheet pile walls
Secant pile Walls
Tangent piles
Diaphragm Walls
Soldier and Tremied Concrete
Soil Mix walls
Combined king pile sheet piles
Slope stability
Cost estimation for braced excavations
Waler-Strut Cofferdams
Snail-Plus 2019: Soil nailing - soil nailing walls
SiteMaster: Inclinometer software (adopted by Geokon)
HelixPile: Helical Pile Software
RC-Solver: Concrete Design ACI-318, EC2, EC8
Steel-Beam: Steel beam column design, full equations, AISC, EC3

Additional Deep Excavation Case Studies

The following table provides basic information on additional case studied for deep excavations. The majority of the deep excavations are supported by slurry walls. Wall Types: RCDW: Reinforced Concrete Diaphragm Wall, SPTC: Soldier Pile & Tremie Wall, SPW: Sheet Pile Wall, SP: Soldier Pile and Lagging, TPW: Tangent Pile Wall, SMW: Soil Mix Wall

Project NameYearRCDWExc. Depth (feet)Support SystemGeneral Soil Conditions
State Transportation (Boston, MA) 1982 RCDW 27 2 Lev. TB, R Fill, Org., Clay, Glacial Till
One Memorial Drive (Boston, MA) 1985 RCDW 30 2 Lev. TB Fill, Org., Clay, Glacial Till
500 Boylston (Boston, MA) 1987 RCDW 42 4 Lev. TB Fill, Org., Clay, Glacial Till
Amoco Standard Oil (Chicago, IL) 1971 RCDW 23 - 44 1 Lev. TB Fill, Org., Clay, Glacial Till
Water Tower (Chicago, IL) 1973 RCDW/ SPTC 44 1 Lev. TB and 1 Lev. R Fill, Org., Clay, Glacial Till
Prudential 2 (Chicago, IL) 1986 RCDW/ SPTC 25 1 Lev. TB, and 1 Lev. R Fill, Org., Clay, Glacial Till
AT & T Corp. Center (Chicago, IL) 1987 RCDW 27 3 Lev. Rakers Fill, Org., Clay, Glacial Till
Northwestern University (Chicago, IL) 1993 RCDW 23 1 Lev. Tiebacks Fill, Org., Clay, Glacial Till
Museum of Science and Industry (Chicago, IL) 1996 RCDW 34 3 Lev. Tiebacks Fill and Stiffer Clays
60 State Street Bldg. (Boston, MA) 1975 RCDW 32 3 Lev. Tiebacks Fill, Glacio-Marine
Dana Farber Tower (Boston, MA) 1995 RCDW 88 6 Lev. Rakers Fill, Glacio-Marine, Bedrock
World Bank Bldg. (Washington, DC) 1991 RCDW 60 5-Lev. Tiebacks Mixed Sands, Silts & Clays, Rock
Washington Conv. Center (Washington, DC) 2000 RCDW 30 1-Lev. TB, and 1 Lev. R Mixed Sands, Silts & Clays
75 State Street Building (Boston, MA) 1983 RCDW 65 6-Lev. Top/Down Fill, Org., Clay, Till, Bedrock
Rowes Wharf (Boston MA) 1984 RCDW 55 5-Lev. Top/Down Fill, Glacio-Marine, Bedrock
125 Summet Street Bldg. (Boston, MA) 1990 RCDW 60 6-Lev. Top/Down Fill, Org., Clay, Till, Bedrock
Post Office Square Garage (Boston, MA) 1989 RCDW 75 7-Lev. Top/Down Fill, Org., Clay, Till, Bedrock
Beth Israel Hospital (Boston, MA) 1994 RCDW 55 7-Lev. Top/Down Fill, Org., Clay, Till, Bedrock
Millenium Place Bldg. (Boston, MA) 1998 RCDW 55 7-Lev. Top/Down Fill, Glacio-Marine, Bedrock
Guest Quarters Hotel (Chicago, IL) 1989 RCDW 35 3-Lev. Top/Dow Fill, Org., Clay, Glacial Till
M.B.T.A. South Cove (Boston, MA) 1973 RCDW 53 3-Lev. Cross Lot Braces Fill, Org., Clay, Till, Bedrock
Flagship Wharf Bldg. (Boston, MA) 1989 RCDW 47 3-Lev. Cross Lot Braces Fill, Org.,Glacial Outwash, Glacial Till,
Petworth Subway Station (Washington, DC) 1995 RCDW 60 6-Lev. Cross Lot Braces Fill, Sands
C.N.A Tower . Building (Chicago, IL 1970 RCDW 31 1 Lev. Rakers and Berms Fill, Org., Clay, Glacial Till
Sears Tower (Chicago, IL) 1971 RCDW 32 3 Lev. Rakers and Berms Fill, Org., Clay, Glacial Till
CB-1 (Yerba Buena) Tower (San Francisco, CA) 1999 RCDW 66 2 Lev. Struts, 1 Lev. Rak, (Alt Tieback) Fill, Org., Sand, Bay Mud.
Beso Mare (Patras, Greece) 2001
25 (7.5 m) 1 Lev. TB Interbedded Clays & Silts

*Most of these case studies have been compiled through graduate research at MIT. We would like to recognize and thank all companies and individuals for their contributions, making such an extensive compilation possible. These include (but not limited), GEI consultans, Haley & Aldrich, STS consultants, Mueser Rutledge Consulting Engineers, Shnabel Foundattions, and Clark Foundations.