ADDITIONAL DEEP EXCAVATION CASE STUDIES

The following table provides basic information on additional case studied for deep excavations. The majority of the deep excavations are supported by slurry walls. Wall Types: RCDW: Reinforced Concrete Diaphragm Wall, SPTC: Soldier Pile & Tremie Wall, SPW: Sheet Pile Wall, SP: Soldier Pile and Lagging, TPW: Tangent Pile Wall, SMW: Soil Mix Wall

Project Name

Year

Wall Type

Exc. Depth (feet)

Support System

General Soil Conditions

State Transportation (Boston, MA)

1982

RCDW

27

2 Lev. TB, R

Fill, Org., Clay, Glacial Till

One Memorial Drive (Boston, MA)

1985

RCDW

30

2 Lev. TB

Fill, Org., Clay, Glacial Till

500 Boylston (Boston, MA)

1987

RCDW

42

4 Lev. TB

Fill, Org., Clay, Glacial Till

Amoco Standard Oil (Chicago, IL)

1971

RCDW

23 - 44

1 Lev. TB

Fill, Org., Clay, Glacial Till

Water Tower (Chicago, IL)

1973

RCDW

44

1 Lev. TB and 1 Lev. R

Fill, Org., Clay, Glacial Till

Prudential 2 (Chicago, IL)

1986

RCDW/ SPTC

25

1 Lev. TB, and 1 Lev. R

Fill, Org., Clay, Glacial Till

AT & T Corp. Center (Chicago, IL)

1987

RCDW/ SPTC

27

3 Lev. Rakers

Fill, Org., Clay, Glacial Till

Northwestern University (Chicago, IL)

1993

RCDW

23

1 Lev. Tiebacks

Fill, Org., Clay, Glacial Till

Museum of Science and Industry (Chicago, IL)

1996

RCDW

34

3 Lev. Tiebacks

Fill and Stiffer Clays

60 State Street Bldg. (Boston, MA)

1975

RCDW

32

3 Lev. Tiebacks

Fill, Glacio-Marine

Dana Farber Tower (Boston, MA)

1995

RCDW

88

6 Lev. Rakers

Fill, Glacio-Marine, Bedrock

World Bank Bldg. (Washington, DC)

1991

RCDW

60

5-Lev. Tiebacks

Mixed Sands, Silts & Clays, Rock

Washington Conv. Center (Washington, DC)

2000

RCDW

30

1-Lev. TB, and 1 Lev. R

Mixed Sands, Silts & Clays

75 State Street Building (Boston, MA)

1983

RCDW

65

6-Lev. Top/Down

Fill, Org., Clay, Till, Bedrock

Rowes Wharf (Boston MA)

1984

RCDW

55

5-Lev. Top/Down

Fill, Glacio-Marine, Bedrock

125 Summet Street Bldg. (Boston, MA)

1990

RCDW

60

6-Lev. Top/Down

Fill, Org., Clay, Till, Bedrock

Post Office Square Garage (Boston, MA)

1989

RCDW

75

7-Lev. Top/Down

Fill, Org., Clay, Till, Bedrock

Beth Israel Hospital (Boston, MA)

1994

RCDW

55

7-Lev. Top/Down

Fill, Org., Clay, Till, Bedrock

Millenium Place Bldg. (Boston, MA)

1998

RCDW

55

7-Lev. Top/Down

Fill, Glacio-Marine, Bedrock

Guest Quarters Hotel (Chicago, IL)

1989

RCDW

35

3-Lev. Top/Dow

Fill, Org., Clay, Glacial Till

M.B.T.A. South Cove (Boston, MA)

1973

RCDW

53

3-Lev. Cross Lot Braces

Fill, Org., Clay, Till, Bedrock

Flagship Wharf Bldg. (Boston, MA)

1989

RCDW

47

3-Lev. Cross Lot Braces

Fill, Org.,Glacial Outwash, Glacial Till,

Petworth Subway Station (Washington, DC)

1995

RCDW

60

6-Lev. Cross Lot Braces

Fill, Sands

C.N.A Tower . Building (Chicago, IL

1970

RCDW

31

1 Lev. Rakers and Berms

Fill, Org., Clay, Glacial Till

Sears Tower (Chicago, IL)

1971

RCDW

32

3 Lev. Rakers and Berms

Fill, Org., Clay, Glacial Till

CB-1 (Yerba Buena) Tower (San Francisco, CA)

1999

RCDW

66

2 Lev. Struts, 1 Lev. Rak, (Alt Tieback)

Fill, Org., Sand, Bay Mud.

Beso Mare (Patras, Greece)

2001

RCDW

25

(7.5 m)

1 Lev. TB

Interbedded Clays & Silts

 

*Most of these case studies have been compiled through graduate research at MIT. We would like to recognize and thank all companies and individuals for their contributions, making such an extensive compilation possible. These include (but not limited), GEI consultans, Haley & Aldrich, STS consultants, Mueser Rutledge Consulting Engineers, Shnabel Foundattions, and Clark Foundations.

 

 

Home | About | Clients | Contact | Resources | Services/Construction
Deep Excavations | Program Features | Case Studies | Downloads | News & Updates | Discussion Forum

Copyright ©2006 DeepExcavation. All Rights Reserved.