HOME | ABOUT | CLIENTS | CONTACT | RESOURCES
DEEPCONTRACTOR VERSION 2007

FULL VERSION OF DEEP

Deep Excavation Engineering Program
Background
Main features
Web demo
Terms of Use
Download Updates
Order

DEEP 2007 CONTRACTOR - Sample Images

DEEP 2007: Results from Soil Spring Analysis with EUROCODE 2007 Geotechnical and Two Opposite Walls.

Deep 2007 Contractor incorporates the use of Eurocode 2007 and Eurocode 1997 Part 7 for Embedded Walls. Strength reductions on the friction angle, effective cohesion, or undrained shear strength can be applied at any stage that it is desired. Surcharge loads are multiplied accordingly by the Eurocode factors for permanent and temporary loads..

 

Home | About | Clients | Contact | Resources | Services/Construction
Deep Excavations | Program Features | Case Studies | Downloads | News & Updates | Discussion Forum

Copyright ©2006 DeepExcavation. All Rights Reserved.